Installation

Installation by licensed, experienced professionals.

Stage: Supervision

Start a project

Our electricians, if you need them

If your project does not have its own team of electricians, we will provide our specialists, who have worked on projects in Cyprus and Europe for years.

All our electricians have the necessary education and a licence for electrical work.

Or supervision of your team

When your own electricians do the work, we can supervise the installation, as we did on the Private Villa project.

Checks before installation

Recesses and cut-outs
Ceiling voids deep enough and cut-outs matching the fixtures on site, not only on the datasheet.
Heat dissipation
Space and air around LED fittings; no insulation over fittings that are not rated for it.
Access to drivers
Every remote driver reachable through a fitting opening or a hatch, never sealed in plasterboard.
Outdoor junctions
Junction boxes and glands with the right IP rating, gel or resin where needed.
Circuits match the group scheme
Power and control cabling checked against the drawings before ceilings close.

Common failures we avoid

  • Overheated LED strip

    Strip without an aluminium profile or with too many watts per metre: early failure and colour shift.

  • Mismatched white

    Fixtures from different batches side by side, one slightly green, one slightly pink.

  • Dimming flicker

    Driver and dimmer that do not match, visible at low levels and on camera.

  • Moisture outdoors

    Wrong glands, wrong mounting position, no drainage: condensation inside the glass.

  • Voltage drop

    Long 12 or 24 V runs fed from one end get dimmer towards the far end.

Voltage drop, and how we prevent it

To keep the brightness even, we feed a long strip from both ends or from the middle, use a heavier cable, or switch to a higher-voltage strip with drivers closer to the run.

DriverL = 10.0 m100%90%80%70%BrightnessDistance along the runFed from one endFed from both ends Voltage drop, 24 V stripULDNTSULD-05 DriverL = 10.0 m100%80%BrightnessDistance along the runFed from one endFed from both ends Voltage drop, 24 V stripULDNTSULD-05

Commissioning and handover

Addressing and grouping
Every DALI or KNX device addressed and grouped as on the drawings.
Scene programming
Scenes set on site with you, in the evening, when they can be judged.
Aiming
Spots, uplights and floodlights aimed and locked.
Lux check
Measured with a lux meter against the calculation.
Handover documents
As-built drawings, fixture schedule, scene table, datasheets and the manufacturers’ warranty documents.

Questions we are often asked

How much does a lighting project cost?

It depends on the scope, the size of the building and the fixtures. We give a quote after we have seen the drawings.

When should a lighting designer join the project?

As early as possible, before the wiring and the ceilings are fixed. Moving a cable route on paper costs nothing; on site it means opening walls.

Can you do only the calculation, or only the supply?

Yes. Every service can be ordered on its own or as part of a full project.

Will you work with my electrician?

Yes. Your electrician gets our drawings, and we can supervise the installation.

Do you make visualisations?

Yes, for the main spaces and facades, so you can see the result before buying anything.

What is the warranty?

The manufacturer’s warranty on the fixtures, on its terms. If something fails, we handle the claim with the manufacturer for you.

It’s time to light up.

Request

Tell us about your project

Pick what applies. Only your name and a phone or email are required.Ask your question and leave a phone or email, that is enough for us to reply.

+357 25 281 882info@uld.cy

01What you need
02The building

Type

City

Stage

03Projects you liked

    Open any project and press “I want something like this”, it will appear here.

    04Your question
    05Files
      06How to reach you

      Preferred

      Nothing selected yet

      We use your details only to reply to this request. Privacy policy